We are finally back at home after a lovely week up at the boat. The weather has been, and still is, amazing. Here are a few more pictures of “Chance’s” progress.
Front doors all finished and trimmed. The headlights are still to be fitted – the wires can be seen either side of the front doors.
Shower surround and thermostatic controls all fitted.
Toilet is in place and touch controls for the flush are on the side of the sink unit. There are four options on the type of flush! – evening classes start next week!
Rear steps from the bedroom to the rear deck. The bottom step slides in and out to give more space inside if needed. Storage as well inside the steps.
The bed is now built and just awaiting its mattress and the wardrobe is just awaiting its doors.
Cupboards above the bed are all made, just awaiting all the doors to be made.
The rear deck at present - the porthole has been fitted in the rear door. The wood seating rail to go around the stern is next on the list.